Quality

The quqlity of the product or services depends on Good quality plan & meticulos implementation of the same.

At CEPL it is established & demonstrated by established QMS based on ISO 9001:2008 for process of Design, Manufacturing & Execution of turnkey projects for which company is certified.

Apart from this the company has got products type tested for various electrical standards from CPRI as listed below.

 
Type Test Reports
Equipment Type Standard Test Carried Out Certificate No.
415V, 3200A LV Control Panel IS 8623 Part-I-1993
IEC 60493 Part-I-1985
Temperature Rise Test at 3200 Amp DCCD-11071(A) Dated 01.09.2009
415V, 3200A LV Bus Duct IS 8623 Part-I-1993
IEC 60493 Part-I-1985
Temperature Rise Test at 3200 Amp DCCD-11071(B) Dated 01.09.2009
Low Voltage Switchgear and Control Assembly- LT Panel (Without Breaker in Circuit) Sub Clause 8.2.3 of IS 8623 (Part I): 1993
IEC Pub 439-1 (1985) (Reaffirmed 2004)
Verification of the short circuit withstand strength i.e. 50kA rms for 1second with 105kA Peak on phase bus bars SC09472A
Dated 01.09.2009
Low Voltage Switchgear and Control Assembly-Bus Way Sub Clause 8.2.3 of IS 8623 (Part I): 1993
IEC Pub 439-1 (1985) (Reaffirmed 2004)
Verification of the short circuit withstand strength i.e. 50kA rms for 1second with 105kA Peak on phase bus bars SC09472B
Dated 01.09.2009
415V, LT Panel IEC 13947 (Part-I) 1993 Degree of Protection IP-55 2009/STL/683
Dated 04.09.2009
12kV, 1250A, Indoor VCB Panel IEC:62271-200, 2003 Short time and peak withstand tests i.e. 26.3kArms for 1.0 sec. with initial peak of 65.75kA S2110127
Dated 11.02.2011
12kV, 1250A, Indoor VCB Panel IEC:62271-200, 2003 Degree of Protection IP-4X 2011/STL/146
Dated 11.05.2011
12kV, 1250A, Indoor VCB Panel IEC:62271-200, 2003 Lightning impulse withstand test at 75kVpeak 2011/STL/263
Dated 05.05.2011
12kV, 1250A, Indoor VCB Panel IEC:62271-200, 2003 Dry power frequency voltage withstand test at 28kVrms for 1 minute 2011/STL/263
Dated 05.05.2011
12kV, 1250A, Indoor VCB Panel IEC:62271-200, 2003 Short time and peak withstand tests i.e. 26.3 kArms for 1.0 sec with initial peak of 65.75 kA 2011/STL/263
Dated 05.05.2011
 
Having worked for company like ASB international which is 100% Japanese EOU for more than a decade, the work culture in CEPL for manufacturingis developed to acheive zero defect production.
 
 
 
 